Manufacturing and production
Order Confirmation and Production Scheduling
Final Confirmation Plan
Water feature configuration list (including name, quantity, height, angle, and movement type of each nozzle)
Water pump model, power, quantity, head, and flow rate
Fountain control cabinet/PLC brand and model, control method (music control/program control/remote)
Lighting scheme (number of fixtures, power, RGB/monochromatic, DMX512 or other protocols)
Total power, total voltage requirements, three-phase power specifications
Whether special effects such as water curtain/laser/projection/fog system/torch/air blast are included
Equipment quality inspection and testing
Quality testing
A comprehensive evaluation of the physical properties, durability, and reliability of materials and components such as nozzles and pipes is conducted.
Equipment commissioning
This includes electrical system debugging, mechanical system debugging, hydraulic performance debugging, control program debugging, and music and lighting system debugging.
The goal is to ensure that all components of the equipment function properly and in coordination, meeting design requirements and laying the foundation for rapid commissioning after on-site installation.